
SPACE:
Stage area 7x7 metres (A).Minimum 9 metres to the roof or other obstructions
(C). 16 metres (B) of clear space for the pegs. 20 meters (D) to raise the
structure. For other arrangements, let us know at least 3 weeks in advance.
Karl is responsible for the setup( Karl: +34 659 404 939)
GROUND:
The stage area (A) must be fairly level. The structure can be anchored
with pegs or pression pegs. For other arrangements call our mate Karl.
TIMES OF ADMISSION:
6 hours for get in and minimum 2 hours for get out.
LIGHTS:
Covered by the group (we need 2500W)
SOUND:
Covered by the group to a maximum of 800 audiens (we need 1200W)
OTHER REQUIREMENTS:
· The presence of one person from the organisation, from the arrival
until the departure of the company.
· Mineral water (6 big bottles).
· The audience is to be seated on chairs.
· Access to the stage area with the company van.(Mercedes Sprinter 313 cdi. Numberplate:
2561 BMH. Height: 2,57m. Length: 6,59m. Width: 1,93m)
· Any questions contact our mate Karl:+34 659 404 939.
